|
|
|
In order to traverse the locomotive from side to side, jack bases are used. These physically wind the jacks across.
|
|
|
|
A jack base being modified to take the new MFD hydraulic jacks purchased by the society
|
|
|
|
|
4 jacks with 480 ton capacity are controlled from one pod
|
|
|
|
The locomotive starts to lift
|
|
|
|
|
Typical jack set up, without traverser plates in situ
|
|
|
|
|
The jack has two lifting rams, the second is just being deployed
|
|
|